This first group of picture are some before and after shots
of a pond that we recently had to drain, dredge and restore
to a pristine vista. We started with only an average depth
of 3' of water. After we did our job we ended up with an
average of 8' of water. We also had to raise the
overflow tube 14" to aid in the depth control.
Job was completed in 7 days from start to finish.
#1
#2
#3
#4
#5
#6
#7
The following group of pictures are from another job we do
for the Heritage Lake P.O.A. in Indiana. In the pictures below
you will see various shots of our mechanical barge
completing some silt removal and dredging.
The following group of pictures are from a job we did
for a resident at Heritage Lake in Indiana. In the pictures below
you will see various shots of our mechanical barge
placing rip rap along the shore line of their property.